Now that the boiler is back on British soil, and strides are being made in Darlington to have it steam tested and re-cladded within the next few weeks, it's all hand on in Loughborough to ensure that the frames are aligned and other components are ready for reassembly. Pipework has been returned to the cab, the frames are painted, and the tender is all but complete, with ETCS changes made, and glossy new paintwork. Take a look at the gallery below for the latest images from LMS.